We installed the StormVault Retention System on a 12-hectare commercial development in Mississauga. The first month showed consistent drawdown within 18 hours after a 25mm rain event, and the oil-grit separator captured visible sediment during the initial flush. The pre-cast sections aligned well on site, and the HDPE liner installation went ahead without delays. The only issue was a minor misalignment on one vault joint, which the field team corrected within an hour. Overall, the system met the 50-year storm requirement and passed the municipal inspection on the first pass.
2024-11-15 A Review After the First Month